For questions or support
Call + 31 (0)180 44 50 18 + 31 (0)180 44 50 18

 

Young plants project type 2

Problem definition

In order to control the delivery process, there was a requirement for a logistic solution to control the mechanization and operation activity of orders generated in a higher-level ERP system.

Solution

For this project, a sorting and delivery system has been implemented that includes scanning points for product identification, and a printing system for printing specific product and order information, including the destination location, on the sorting system. Feedback to the higher-level ERP system has been achieved so that products from a specific order can be identified (and registered) for tracking and tracing purposes.

The visualization of the logistic (sorting) process and the order handling (MES)  is provided by ISAL.

Specific features
  • Implementation of the  ISA'95 standard between ISAL (MES) and the higher-level ERP system
  • the generation of production plans
  • the generation of master pick-up/picking lists
  • the generation and visualizing of cart layouts/building
  • providing a link to a cart building apparatus
  • the display of KPI dashboards

 

 

Used modules

Young plants project type 2